How Long Does a Kitchen Remodel Take in the San Gabriel Valley?

Most full kitchen remodels in the San Gabriel Valley run something like 5 to 8 months from your first call to final inspection, with 6 to 10 weeks of that being active construction once your design is finalized, materials are ordered, and permits are approved. The construction number is the one people search for, but it's only part of the real timeline. The design, selection, and permitting phase before demolition even starts often takes as long as construction itself, and that's by design, not a delay. We intentionally take on one to two projects a month, which means more of our attention on your project and fewer surprises once we break ground.

What Are the Phases of a Kitchen Remodel, in Order

It generally breaks into three stages. First, design and selection: measuring your space, finalizing your layout, choosing cabinetry, countertops, and finishes, and preparing plans, which typically takes several weeks to a couple of months depending on how quickly decisions are made. Second, permitting: submitting to the city and waiting on plan check, which runs 6 to 10 weeks for structural kitchen work in Pasadena specifically. Third, construction: demolition, rough plumbing and electrical, inspections, cabinetry and countertop installation, and finish work, which is the stretch most people mean when they ask how long a remodel takes.

How Long Is Design and Selection Before Demo Even Starts

For a full kitchen remodel, expect design and selection to take several weeks to a couple of months, depending mostly on how quickly you can finalize decisions like layout, cabinetry, and countertops. This phase moves faster when you visit the showroom early and narrow down finishes before we finalize drawings, and slower when major layout questions are still open. We'd rather take the time here than start construction on a design that's still changing.

What Does Plan Check Add to the Overall Timeline

In Pasadena specifically, plan check on a kitchen remodel with structural, electrical, or plumbing changes typically runs 6 to 10 weeks, and that clock doesn't start until your design is finalized and submitted. Add design and selection on one end and construction on the other, and a realistic full timeline for a kitchen remodel in Pasadena runs roughly 5 to 8 months, first call to final inspection.

This runs in parallel with ordering long-lead items like custom cabinetry, so it's not necessarily dead time, but it's time you should plan for rather than be surprised by.

Can You Stay in Your Home During the Remodel

In most cases, yes, though your kitchen itself will be unusable for a meaningful stretch of the construction phase. We set expectations up front about which weeks affect water and gas access, seal off the work area to control dust, and keep the site clean and safe throughout. Some homeowners set up a temporary kitchen elsewhere in the house. We'll tell you honestly whether that makes sense for your specific project.

What Causes the Most Delays in a Kitchen Remodel

The two biggest causes are late decisions on selections, such as choosing a countertop or backsplash after cabinets are already ordered, and unexpected conditions behind the walls once demo starts, like outdated wiring or plumbing that needs to be brought up to code. Custom cabinetry lead times can also shift a schedule if they aren't ordered early enough.

This is part of why we take on only one to two projects a month. It's not a capacity limitation so much as a decision, one three generations in the making, to give each project the attention that avoids these delays in the first place.

Ready to Talk About Your Project?

Book a free design consultation, or stop by our Pasadena showroom to see materials in person.

Let's talk about your project

Tell us about your project and we'll set up a free design consultation at your home or in our Pasadena showroom.

  • (818) 572-6888Mon–Fri 9–5 · Sat 10–4
  • 3250 E Colorado BlvdPasadena, CA 91107 · showroom open to visitors
  • Free design consultation + 3D renderingSee your new kitchen in 3D before you commit.
  • Licensed California contractorCSLB #1093261 · verify online

Book your free design consultation

A designer follows up the same business day. No obligation.

Prefer to talk? Call (818) 572-6888. We'd love to hear about your project.

Thank you. We've got it.

A designer will reach out the same business day to schedule your consultation. For anything urgent, call (818) 572-6888.

Call Now Free Consultation